The last of the windows were installed last week, which means the house is finally closed in. We don't have a front door yet, but at least we no longer have to worry about snow piling up inside. A good portion of the plumbing has been installed, including a Power Pipe which will be used to recapture heat energy from waste water that would otherwise lost down the drain.